

Excluding PDF versions, files above are HTML and good for viewing.
Please select the PDF link for printable copies. The PDF files are
larger than their counterpart HTML files and will take longer to view due to
download times.
Comminutors Manufactured By
G.E.T. Industries Inc.
T (905) 451-9900 or (877) 213-7418 F (519) 927-3261
Home
Contact Us
Site Map
To view some files on this site you will
require the Free Adobe Reader
Links:
![]()
![]()
![]()
MODEL 7A-6 - SPECIFICATIONS
1.0
General Specifications
There shall
be furnished one (1) one only Grind HogTM Model 7A-6 Comminutor
as manufactured by
G.E.T. Industries Inc. with rotation in a
counter-clockwise direction.
1.1
Design Criteria
The comminutor shall be
designed to handle the flows indicated below, within the head loss noted.
a) hydraulic capacity 315 GPM (19.9 l/s)
b) satisfactory operation shall occur under conditions of zero flow
c) head loss at peak flow shall not exceed 10 inches (250)
d) design shall be
such that the flow enters the size reduction and screening device
horizontally and
exists vertically downward to facilitate the flushing of
solids
1.2
Rotating Drum Screen
a) heavy-duty Cast Ductile Iron ASTM 536, grade 60-45-18
1.3
Cutting Elements
a) replaceable shear
bars constructed of high-quality A2 tool-steel shall be attached to the
rotating
drum. Each shear bar shall be machined from solid bar stock,
surface ground to establish exact
tolerance
b) stationary cutting
bar shall be of high-quality 01 tool steel hardened to a minimum of 56
Rockwell C,
and shall be reversible, allowing for four (4) sets of cutting
edges prior to sharpening or replacement
c) all submerged fasteners shall be of stainless steel
1.4
Flanged Body
a) the body of the
comminutor shall be of high quality cast iron and so designed to allow free
unobstructed flow of influent through the unit. A Neoprene “O” Ring shall
seal the chamber, allowing
for operation under conditions of abnormally high
head
b) the inlet flange shall be 6" (150)
1.5
Motor
TEFC 1 Hp. Motor suited to
outdoor weatherproof service (IP55) on _____ volt, ____ phase, ____ cycle
service. Close-coupled
1.6
Drive Arrangement
a) the motor shall be
close-coupled to a speed reducer drive, a heavy duty planetary gear of the
totally
enclosed non-vented type suitable for total submergence during
emergencies
b) double seals on
the output shaft shall ensure flood-proof operation through a reduction
ratio of 35:1
c) the cycloidal
reducer shall be capable of withstanding shock loads to 500% of its
mechanical rating
of 1.61 Hp. and be warranted for two (2) years
d) the drive shall
have a minimum full load efficiency of 90% and be pre-lubricated with
grease,
requiring routing maintenance every 500 to 1,000 hours
A)
Auto-Coupling Slide Rail - Wet Well
a) each Grind HogTM
shall be equipped with a Slide Rail System allowing for removal without
entering
the wet well
b) a stationary PVC
Overflow Coupling Box Assembly shall be flange mounted to the gravity sewer
pipe
as shown on the drawings. An open top will allow for overflow in the
event of a disruption in service
c) Guide Rails shall
be of 304 stainless steel pipe, 1.5" in diameter, and shall be of adequate
length as
shown on the drawings
d) Guide Rail
Supports shall be 304 stainless steel and shall be mounted to the wet well
wall
e) all anchorage hardware shall be of stainless steel and shall be
supplied by the contractor
B)
Auto-Coupling Slide Rail - Chamber
a) each Grind HogTM
shall be equipped with a Slide Rail System allowing for removal without
entering
the wet well
b) a stationary
galvanized steel Overflow Bar Screen and influent trough shall be mounted
under the
gravity sewer pipe as shown on the drawing. Support brackets and
hardware shall be provided (304
S.S.). Anchorage shall be supplied by the
contractor
c) Guide Rail
Supports shall be of 304 stainless steel pipe, 1.5" diameter, and shall be
of adequate
length as shown on the drawings
d) Guide Rail
Supports shall be 304 stainless steel and shall be mounted to the wet well
wall
e) Mounting hardware shall be of stainless steel and shall be supplied by
the contractor